If the last OASIS was 06 (Transfer) then the next one has to be 03 (Resumption). If there is an 06 without an 03, the button will be disabled. The way to remedy this is to look back in the chart and see if there was an 03 and, if not, to put it in. After the 03 is available, the button to add a transfer OASIS will be enabled.